Huntington Ingalls Industries won a U.S. Navy contract to build 10 ROMULUS uncrewed surface vessels for the MUSV program. The vessels will use HII's Odyssey Autonomous Control Solutions, a modular autonomy suite supporting perception, navigation, payload management and multi-platform coordination with AI integration.
What's happening
- HII will manufacture 10 ROMULUS uncrewed surface vessels under a Navy contract for the MUSV program.
- The vessels use Odyssey Autonomous Control Solutions, a modular open-architecture autonomy suite enabling unmanned operations with limited human intervention.
- The autonomy system completed Navy-monitored operational testing in the Gulf of America, including a 420-nautical-mile mission lasting 28 hours.
- HII plans to use a distributed production model with regional shipbuilders and suppliers to support manufacturing.
Why it matters
- The contract establishes production capability for the Navy's medium-class unmanned surface vessel fleet, expanding autonomous maritime capacity.
- Odyssey Autonomous Control Solutions is designed as an open-architecture system supporting integration of new sensors, command-and-control technologies and AI algorithms, reducing future customization costs.
- Operational testing validates the autonomy system's performance in extended 28-hour missions at sea, reducing procurement risk for follow-on vessel orders.
- The distributed regional production model distributes manufacturing load across HII's supply chain, building industrial base resilience for unmanned vessel production.
The intrigue
- The contract ceiling value and obligated funding amount are undisclosed, leaving unclear how much revenue this tranche of 10 vessels represents against the Navy's total MUSV procurement plan.
The fine print
- Contract value is undisclosed; timing of revenue recognition over the period of performance is not stated.
- The open-architecture design of Odyssey Autonomous Control Solutions is intended to accommodate future sensor and AI algorithm upgrades, but integration costs and timelines are not detailed.