Industrial Base Alpha

Senate affirms EMALS for Ford-class carriers, rejecting steam catapult pivot

•2 min read•Analysis
An E-2D Hawkeye on the flight deck of USS Gerald R. Ford, with a sailor on the deck, a U.S. Navy photograph. The catapult is not in view. Sand and navy duotone. Headline: Senate Affirms EMALS For Ford-Class Carriers.
U.S. Navy photo by Petty Officer 2nd Class Alexander Cascone. Rights basis: public_domain_usgov. Adapted to sand and navy. Source: https://commons.wikimedia.org/wiki/File:USS_Gerald_R_Ford_(CVN_78)_Flight_Deck_Operations_(9510925).jpg
Mentioned:General Atomics

Bipartisan senators affirmed support for continuing the Electro-Magnetic Aircraft Launch System on Ford-class carriers during a November 17 confirmation hearing, directly opposing a Trump administration directive issued August 13 that called for replacing EMALS with steam catapults.

What's happening

  • Trump administration issued memorandum August 13 directing the Navy to plan replacement of EMALS with steam and hydraulic catapult systems on aircraft carriers.
  • Senators Tim Kaine (D-Virginia) and Roger Wicker (R-Mississippi) stated during the Senate Armed Services Committee confirmation hearing that returning to steam catapults is not acceptable.
  • USS Gerald R. Ford, the first carrier equipped with EMALS, returned from a 326-day deployment in May 2026 during which sailors praised the electromagnetic system's performance.

Why it matters

  • Reverting to steam catapults would delay carrier production further, as the Ford-class already faces production delays that have extended schedules by 7 years.
  • Current delays are reducing carrier availability to 9 of the 11 carriers required by law, creating a gap in Navy force structure during critical operational periods.
  • Switching catapult systems mid-production would require costly design changes and reduce capability, adding significant expense to an already stretched acquisition timeline.
  • General Atomics' EMALS contract and production roadmap depend on continuing the current system across the Ford-class fleet.

Going deeper

  • The USS Gerald R. Ford's operational record now provides empirical evidence that EMALS performs reliably at sea, with 326-day deployment including combat operations off Iran.
  • Kaine reported that sailors with experience on both steam and electromagnetic systems preferred the EMALS technology, contradicting claims of systemic unreliability.
  • Under Secretary Cao acknowledged EMALS and weapons elevator issues have delayed carriers by 7 years but did not explicitly commit to rejecting the steam catapult mandate.

The intrigue

  • Cao's focus on carrier availability gaps and schedule acceleration suggests tension between addressing legacy EMALS issues and avoiding production delays that would result from a system redesign.

The fine print

  • Senate affirmation does not constitute final rejection of the Trump administration directive; the Secretary of Defense and Secretary of the Navy must still respond to the August 13 memorandum.
Source: seapowermagazine.org · Nov 17, 2026 · Drafted with Claude, reviewed by Industrial Base Alpha.

Related stories