Industrial Base Alpha

L3Harris wins $60M Army contract for extended-range C-UAS missile

•1 min read•Analysis
A rendering of the L3Harris long-range ramjet counter-drone interceptor in flight, isolated on a plain sand background.
L3Harris Technologies (rendering). Rights basis: press_kit
Mentioned:LHX L3Harris Technologies$60M · Contract Award

L3Harris Technologies won a $60 million three-year Army contract to develop an extended-range counter-unmanned aircraft system missile. The award moves the company into Phase 2 of the Army's XRC program, which prioritizes more capable and affordable drone defenses.

What's happening

  • L3Harris received a $60 million contract from the U.S. Army on October 23, 2026.
  • The three-year award covers Phase 2 development of the eXtended Range Counter-sUAS Missile (XRC) program.
  • Work includes flight performance testing of the extended-range interceptor missile.
  • The contract moves L3Harris forward in the Army's effort to field longer-range counter-UAS capabilities.

Why it matters

  • Extended-range C-UAS missiles address an operational gap as adversaries deploy drones at greater standoff distances.
  • The Army is prioritizing affordable counter-UAS defenses, and this contract funds development of a more cost-effective interceptor option.
  • Flight testing in Phase 2 will validate performance specifications needed for potential production and fielding decisions.
  • L3Harris maintains a key position in the Army's drone defense industrial base alongside existing air defense manufacturers.

Financial impact

  • Contract revenue of $60 million will be recognized over the three-year performance period beginning October 2026, timing not disclosed for quarterly allocation.
  • The award adds to L3Harris backlog and supports capacity utilization at the Grand Prairie, Texas facility.
  • Phase 2 funding commits obligated cash for development and testing; total program ceiling value not disclosed.

The fine print

  • Contract is valued at up to $60 million, suggesting potential performance-based adjustments or option years not disclosed.
  • Phase 2 structure implies Phase 3 production contracts remain competitive and subject to future Army decisions.
Source: insidedefense.com · Oct 23, 2026 · Drafted with Claude, reviewed by Industrial Base Alpha.

Related stories

Computer-generated image of an Aster 30 launch from the FDI frigate Amiral Cabanier (D664). Sand and navy duotone. Headline: France Orders Aster Upgrade For Five FDI Frigates.
Munitions

France Orders 32-Cell Aster Upgrade for Five FDI Frigates

France's DGA finalized a contract with Naval Group and MBDA to double air defense capacity on the French Navy's FDI frigates from 16 to 32 Aster missile cells, with retrofits for the first three vessels and new-build configuration for the final two.